Trailer Move, Parking Lot V Closure 1-5 & 1-8

01/05/18

« Back

The Timberline and Pine trailers on West Campus Road will be moving to their new location near the GRL Annex on January 5 and January 8.

This outage includes no parking on Maple Street between West Campus Road and the GRL building from 6am to 6pm on Monday and Friday.

Parking Lot V will also be closed Friday thru Monday. 

Please anticipate intermittent street closures on West Campus Road and Maple Street. These intermittent closures should not last more than 10 minutes.

As always, be aware of your surroundings and follow construction signage and safety personnel’s directions. 

«  January 2018  »
S M T W T F S
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

News (01/13/18)

CoorsTek closed Saturday, 1-13-18

  • The CoorsTek building will be closed for building pressure testing on Saturday, January 13th from 8am to 12:30pm. All exterior entrances will be sealed. ...

ODC Directory

Office of Design and Construction
1801 19th Street
Golden, CO 80401
Main (303)273-3568
ODC@mines.edu

Mike Bowker, PE

Director, Office of Design and Construction

(303)384-2034

mbowker@mines.edu

 

Clay Bosworth 

Project Manager

(303) 273-3338

ncbosworth@mines.edu

 

Kathy Burris

Project Administration Manager

(303) 273-3566

kburris@mines.edu

 

David Feron, P.E.

Engineer

303-384-2535

dferon@mines.edu

 

Robert Lee, AIA

Architect

(303) 384-2519

ralee@mines.edu

 

Susan Miner, AIA

Architect

(303) 384-2517

sminer@mines.edu

 

Mike Ray

Project Planner

303-273-3397

mrray@mines.edu

 

Sheri Atencio-Church

Contracts Administrator

303-273-3615

satenciochurch@mines.edu

Procurement and Business Operations
Supporting the Office of Design & Construction and Operations
 

 

Chris Cocallas, AIA

Assistant Vice President, Planning and Design

University Architect

(303) 273-3920