Jackson Entry Door Construction 2-12 to 2-14

02/12/18

« Back

At 1600 Jackson, there will be construction activity at the entries for the installation of new doors on Monday, Feb. 12 thru Wednesday, Feb. 14.

The installation of these new doors will include a blaster card reader at both the north and south entry doors. Controls will automatically lock the doors during off hours. During off hours, access to the building can be obtained by waving your blaster card over the card reader panel.

Both Mines and non-Mines staff should already have been given their cards, which are programmed into the system. Your card should work immediately after the new doors are installed and the blaster card system is up and running.

During construction, please stay away from the construction staff. Please do not use any door being worked on. Only one door will be worked on at a time.

 

«  February 2018  »
S M T W T F S
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

News (02/09/18)

Jackson Water Outage 2-9-18

  • TO: Jackson Occupants FROM: Robert Lee Outage Date: Friday, 2-9-18 Outage Time: 6am to 8am Purpose:To check for water valve in suite 100 as part of the ...

Library Fire Alarm Notification 2-9-18

  • TO: Arthur Lakes Library Occupants FROM: Susan Miner Outage Date: Friday, 2-9-18 Outage Time: 6:30am to 5pm Purpose: To relocate two smoke detectors for ...

Maintenance Notices

Routine and preventative maintenance which involve service interruptions are posted here.  Please bookmark this page!