Boring Work between Guggenheim & Library 8-19-19

08/19/19

« Back

On Monday, August 19,  contractors will be boring a monitor well in the grassy area between Guggenheim Hall and the Library.

This work will start at 8am and finish in the early afternoon.

As always, when you are near a construction area, please be aware of your surroundings and follow all safety signage and safety personnel’s directions.

Thank you for your cooperation.

 

«  August 2019  »
S M T W T F S
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

News (08/19/19)

Boring Work between Guggenheim & Library 8-19-19

  • On Monday, August 19, contractors will be boring a monitor well in the grassy area between Guggenheim Hall and the Library. This work will start at 8am ...

ODC Directory

Office of Design and Construction
1801 19th Street
Golden, CO 80401
Main (303)273-3568
ODC@mines.edu

Mike Bowker, PE

Director, Office of Design and Construction

(303)384-2034

mbowker@mines.edu

 

Clay Bosworth 

Project Manager

(303) 273-3338

ncbosworth@mines.edu

 

Kathy Burris

Project Administration Manager

(303) 273-3566

kburris@mines.edu

 

David Feron, P.E.

Engineer

303-384-2535

dferon@mines.edu

 

Robert Lee, AIA

Architect

(303) 384-2519

ralee@mines.edu

 

Susan Miner, AIA

Architect

(303) 384-2517

sminer@mines.edu

 

Mike Ray

Project Planner

303-273-3397

mrray@mines.edu

 

Sheri Atencio-Church

Contracts Administrator

303-273-3615

satenciochurch@mines.edu

Procurement and Business Operations
Supporting the Office of Design & Construction and Operations
 

 

Chris Cocallas, AIA

Assistant Vice President, Planning and Design

University Architect

(303) 273-3920