Noise Notification at Site of Future Parking Garage 12-4 to 12-8

12/04/17

« Back

Soil testing is scheduled December 4 through December 8 during the day, on the site of the future Parking Garage.

This area is near the Facility Management office, Lock Shop, Physics trailers, MEP and ROTC houses.

Loud drilling will occur during this time as a small truck collects soil samples. 

«  December 2017  »
S M T W T F S
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

News (12/04/17)

Noise Notification at Site of Future Parking Garage 12-4 to 12-8

  • Soil testing is scheduled December 4 through December 8 during the day, on the site of the future Parking Garage. This area is near the Facility Management ...

Maintenance Notices

Routine and preventative maintenance which involve service interruptions are posted here.  Please bookmark this page!